Expansion Continues at Troegs - 24 New Fermentation Tanks

image We’ve been bringing you all the news from Troegs as they add new bottling lines, fermentation tanks, a canning line and even a new cork & cage line…and now more news from Troegs via ldNews:

In addition, eight new 800-barrel fermenters are on order and should be installed by the end of the year, Herb said. They will be located along the brewery's exterior, probably in the rear, Herb said.

Another update from
Pennlive:

In addition, the brewery will add 24 fermentation tanks with eight of the tanks now awaiting delivery from Baltimore. Co-owner Chris Trogner said it is one of the brewery's largest expansion projects since its move two years ago from Harrisburg to Hershey.

A pad for the 50-foot high tanks has been prepared at the brewery off of Hersheypark Drive. Each tank will hold 800 barrels of beer, or the equivalent of 10,000 cases of beer, he said.


.

About MyBeer Buzz

Founder, owner, author, graphic designer, CEO, CFO, webmaster, president, mechanic and janitor for mybeerbuzz.com. Producer and Co-host of the WILK Friday BeerBuzz live weekly craft beer radio show. Small craft-brewer of the craft beer news sites and one-man-band with way too many instruments to play........Copyright 2007-2024 mybeerbuzz.com All Rights Reserved: Use of this content on ANY site without written permission is not allowed.

0 comments (click to read or post):

Post a Comment

Please leave a comment...I do moderate each comment so it may not appear immediately...and please be nice! You can also comment using Disqus (below) or even comment directly on Facebook (bottom).