Sierra Nevada Aims To Brew First Mills River NC Batch 9/5

image
From the Citizen Times:

Rain has delayed some of the construction work, but “we have a lot of systems that are operational now,” brewery manager Brian Grossman said. “There are lot of others we have not yet begun, but they are not mission-critical.”

It won’t be long before test brewing begins. The tentative date is Sept. 5, he said. Production brewing should be going by year’s end. It will be another year before Sierra’s restaurant and tasting room will open, Grossman said.

This brewery will be huge, dwarfing all other beer-making plants in Western North Carolina. Sierra will start by making 350,000 barrels a year year, and eventually that will grow to 750,000 barrels.
.

About MyBeer Buzz

Founder, owner, author, graphic designer, CEO, CFO, webmaster, president, mechanic and janitor for mybeerbuzz.com. Producer and Co-host of the WILK Friday BeerBuzz live weekly craft beer radio show. Small craft-brewer of the craft beer news sites and one-man-band with way too many instruments to play........Copyright 2007-2024 mybeerbuzz.com All Rights Reserved: Use of this content on ANY site without written permission is not allowed.

0 comments (click to read or post):

Post a Comment

Please leave a comment...I do moderate each comment so it may not appear immediately...and please be nice! You can also comment using Disqus (below) or even comment directly on Facebook (bottom).