Video of new Belgium’s CEO Kim Jordan courtesy of Mountain Express’ Jake Frankel…
From New Belgium’s Bryan Simpson:
FORT COLLINS, CO, July 26, 2012 – New Belgium Brewing executives unveiled conceptual drawings for their new brewing facility to a packed house in Asheville yesterday. The drawings included a “liquid center” tasting room, a 200-barrel brewhouse, malt building, packaging hall and cellar space. A warehouse facility will be built offsite. Executives wanted Asheville residents to see the plan first and have an opportunity to offer feedback.
“There will be impact but we will work hard to make it right,” said New Belgium CEO Kim Jordan. “We could have built on a lot of sites but we wanted to be on a livable, walkable site. This site will be a challenge, but we are up for that challenge.”
The new facility will have to be elevated above the 100-year flood zone along the French Broad River. Buildings and material from the old Asheville stockyard will be recycled during deconstruction this fall with heavy demolition being done November thru December and ground-breaking in January.
The brewery is working with the city and state Departments of Transportation to make infrastructure improvements including the widening of roads, smoothing of curves and the addition of traffic signals. An off-site warehouse facility at a yet-to-be-determined location will minimize trucking traffic in the area.
The brewery will have a 700,000-barrel capacity, producing both bottled and kegged beer for distribution along the east coast. The project is slated for completion in 2015.
0 comments (click to read or post):
Post a Comment
Please leave a comment...I do moderate each comment so it may not appear immediately...and please be nice! You can also comment using Disqus (below) or even comment directly on Facebook (bottom).